Recent Posts

News Archive

Subscribe to News

Nov
21

Mixed Plume Remediation Progress at a North Texas Site

written by Shannon

COC Areas - smallPercent Reduction - smallAt a former industrial facility located in North Texas, H2A has achieved elimination of measurable (mobile) LNAPL in 15 of 16 monitoring wells (94%).  Dissolved BTEX plume reductions of 50-70% have also been noted after operating a custom-designed, multiphase extraction (MPE) remediation system at the site for only three years.  Therefore, both mass removal and compositional change remediation objectives have been realized utilizing MPE, a cost-effective technology compared to other techniques capable of achieving similar remedial endpoints.

Leave a Comment
(email will not be published)

Contact Us

H2A Environmental, Ltd.
1862 Keller Parkway
Keller, TX 76248

817.380.3888 Phone
682.593.0660 Fax

H2A Environmental, Ltd. on LinkedIn