Recent Posts

News Archive

Subscribe to News

Jun
16

H2A Performs 12-Day MDPE Event in Angleton, Texas

written by Shannon

H2A is currently performing a 12-day, mobile dual-phase extraction (MDPE) event at a former petroleum storage tank site located within TxDOT right-of-way in Angleton, Texas (the Site).  This is the latest of seven MDPE events performed by H2A at the Site over the past several years.  During a 12-day event performed in March of this […]

Read More About - H2A Performs 12-Day MDPE Event in Angleton, Texas »

Mar
1

H2A Presents LNAPL Webinars to the Missouri DNR

written by Shannon

H2A’s Mike Hawthorne recently presented two, back to back, one-hour training webinars to the Missouri Department of Natural Resources. The first explored basic tenets of LNAPL science, including multiphase saturation distribution concepts and the benefits of multiphase extraction for both compositional change and saturation reduction in LNAPL remediation. The second webinar discussed LNAPL transmissivity as […]

Read More About - H2A Presents LNAPL Webinars to the Missouri DNR »

Contact Us

H2A Environmental, Ltd.
1862 Keller Parkway
Keller, TX 76248

817.380.3888 Phone
682.593.0660 Fax

H2A Environmental, Ltd. on LinkedIn